Significant Statistics

42,396 square feet TMC facility (two-floors)

Overall Building Dimensions: 159’ x 157’

Approximately 605 copper cable runs for data / voice in the building

Approximately 84,846 feet (16.07 miles) of CAT-E cabling

Approximately 112 fiber runs inside of building

Approximately 12,356 feet (2.34 miles) of fiber optic cables throughout building

192 fiber optic strands leave the TMC, tying into the ITS fiber optic infrastructure for the county

Over 37 miles of fiber connect the TMC to devices and equipment along I-95, I-595 and to other District 4 facilities

Approximately $2 million systems costs (ITS networks, equipment and computer systems)

Approximately 2,000 cubic yards of unsuitable soil demucked / removed

Approximately 20,000 cubic yards of soil excavated at site of new TMC

Approximately 2,000 cubic yards of good soil brought in to replace demucked soil

Approximately 315 concrete cylinder samples taken to test and monitor strength of structure

Approximately 19, 845 cubic feet of foundation cement poured

9 DLP (Digital Light Processing) 67" projection cubes combined in a 3x3 matrix to make a 201" center section of video wall

32 Sony Trinitron 32" TVs to make up 4x4 walls of TVs on both sides of the 201” center video wall matrix

Over 4,123 construction photos taken throughout project

12 Shared Control Room Operator Consoles