TMC Construction History Photo Archive

The SMART SunGuide TMC Being Built
January 7, 2003 − Excavation site preparation for the TMC foundation.
The SMART SunGuide TMC Being Built
January 14, 2003 − Removal of unsuitable soil (demucking) and site preparation for the building foundation.
The SMART SunGuide TMC Being Built
February 5, 2003 − Demolition of rear section of old BCTED building to make room for new TMC construction.
The SMART SunGuide TMC Being Built
February 13, 2003 − Initial placement of concrete for building foundation.
The SMART SunGuide TMC Being Built
March 6, 2003 − Installation of foundation and masonry blocks.
The SMART SunGuide TMC Being Built
March 6, 2003 − Installation of conduits for the emergency generator.
The SMART SunGuide TMC Being Built
March 6, 2003 − Site drainage construction view of “French Drain” installation.
The SMART SunGuide TMC Being Built
March 28, 2003 − Concrete placement for rear canopy foundation.
The SMART SunGuide TMC Being Built
March 31, 2003 − Center view of Control Room up to finished floor level.
The SMART SunGuide TMC Being Built
April 1, 2003 − Control Room view up to finished floor level. Construction of first floor walls and concrete slab (floor).
The SMART SunGuide TMC Being Built
May 8, 2003 − Placement of concrete for the Control Room “sub-floor.”
The SMART SunGuide TMC Being Built
May 8, 2003 − “Floating” concrete of Control Room to “smooth finish.”
The SMART SunGuide TMC Being Built
May 22, 2003 − Completed masonry walls and control room slab. Also, working on floor for area around the control room.
The SMART SunGuide TMC Being Built
May 22, 2003 − Completing remaining 1st floor concrete slab.
The SMART SunGuide TMC Being Built
June 26, 2003 − Placement of concrete over precast joist and floor slab.
The SMART SunGuide TMC Being Built
July 8, 2003 − Construction of 2nd floor structure and exterior walls.
The SMART SunGuide TMC Being Built
August 26, 2003 − Rear / South view of TMC exterior wall up to 2nd floor roof level.
The SMART SunGuide TMC Being Built
August 29, 2003 – Installation of 2nd floor roof precast joists (beams).
The SMART SunGuide TMC Being Built
September 2, 2003 – Side / East view of TMC exterior wall up to roof level.
The SMART SunGuide TMC Being Built
September 2, 2003 – Front / North view of TMC exterior wall up to roof level.
The SMART SunGuide TMC Being Built
September 2, 2003 – Broward County TMC sign structure cutout.
The SMART SunGuide TMC Being Built
September 3, 2003 − Start of exterior veneer block and waterproofing agent.

 

The SMART SunGuide TMC Being Built
September 12, 2003 − Completed 2nd floor topping.
The SMART SunGuide TMC Being Built
October 8, 2003 − Plate compactor preparing ground for main entrance ramp.
The SMART SunGuide TMC Being Built
October 8, 2003 − Delivery of additional interior wall stud loads.
The SMART SunGuide TMC Being Built
October 9, 2003 − Topping Off Celebration inside TMC control room.
The SMART SunGuide TMC Being Built
October 29, 2003 − Construction of the electrical generator enclosure − South end of the TMC.
The SMART SunGuide TMC Being Built
October 30, 2003 − Construction of TMC curb wall over 2nd floor.
The SMART SunGuide TMC Being Built
October 30, 2003 − Construction of TMC curb wall over 2nd floor.
The SMART SunGuide TMC Being Built
November 20, 2003 − Installation of interior drywall.
The SMART SunGuide TMC Being Built
November 21, 2003 − Installation of exterior brick wall.
The SMART SunGuide TMC Being Built
November 22, 2003 − Installation of modified bituminous membrane roofing.
The SMART SunGuide TMC Being Built
December 12, 2003 − Installation of Kohler Power Systems electrical generator (transfer switch).
The SMART SunGuide TMC Being Built
January 12, 2004 − Painting ceiling and walls of TMC Control Room.
The SMART SunGuide TMC Being Built
January 14, 2004 − Installation of front walkway canopy framing.
The SMART SunGuide TMC Being Built
February 5, 2004 − BCTED relocating signalization wires to new building.
The SMART SunGuide TMC Being Built
February 5, 2004 − Waterline tapping sleeve and valve for service to new building.
The SMART SunGuide TMC Being Built
February 5, 2004 − Chiller plants, view of piping, motors and motorized valves.
The SMART SunGuide TMC Being Built
February 9, 2004 − Aerial view of the chiller plants.
The SMART SunGuide TMC Being Built
February 7, 2004 − Early view of the Control Room and video wall cutout.
The SMART SunGuide TMC Being Built
February 9, 2004 − Aerial view of elevator shaft.
The SMART SunGuide TMC Being Built
March 29, 2004 − Installation of TMC workstation consoles and video wall frames.
The SMART SunGuide TMC Being Built
March 29, 2004 − Ladder type cable tray inside of the cross-connect room.
The SMART SunGuide TMC Being Built
March 30, 2004 − Antenna support posts on 2nd floor roof mounted on the elevator tower.
The SMART SunGuide TMC Being Built
April 8, 2004 − View of TMC Control Room at 80% completion.
The SMART SunGuide TMC Being Built
April 14, 2004 − Video wall testing.
The SMART SunGuide TMC Being Built
April 28, 2004 − Installation of office cubicles on Westside of 2nd floor.
The SMART SunGuide TMC Being Built
April 28, 2004 − Plywood sheathing for the metal wall façade to the TMC.
The SMART SunGuide TMC Being Built
May 24, 2004 − Riser conduits from the 1st floor cross-connect closet to the 2nd floor.
The SMART SunGuide TMC Being Built
May 26, 2004 − Installation of metal wall panels.
The SMART SunGuide TMC Being Built
June 15, 2004 − Construction of interior stairs leading to 2nd floor.
The SMART SunGuide TMC Being Built
June 17, 2004 − Data / Voice cabling terminated above cubicle area on 2nd floor.
The SMART SunGuide TMC Being Built
June 17, 2004 − Data patch panels.
The SMART SunGuide TMC Being Built
June 23, 2004 − Installation of stainless steel rails for the main entrance ADA ramp.
The SMART SunGuide TMC Being Built
June 23, 2004 − Construction of the side / east parking lot including placement of asphaltic concrete over primed lime rock base.
The SMART SunGuide TMC Being Built
June 23, 2004 − Placement of asphalt by hand under rear covered parking area.
The SMART SunGuide TMC Being Built
July 8, 2004 − Delivery of tropical trees and plants for landscaping.
The SMART SunGuide TMC Being Built
July 12, 2004 – View of side / east parking lot.
The SMART SunGuide TMC Being Built
July 28, 2004 − View of completed electrical generator enclosure.
The SMART SunGuide TMC Being Built
August 13, 2004 – Front / North view of completed TMC.
The SMART SunGuide TMC Being Built
September 17, 2004 – Equipment Cabinet / Data Servers.
The SMART SunGuide TMC Being Built
September 20, 2004 − View of completed TMC Control Room.
The SMART SunGuide TMC Being Built
October 4, 2004 – Side / East view of completed TMC.
The SMART SunGuide TMC Being Built
October 14, 2004 − View of the Broward County TMC sign.
The SMART SunGuide TMC Being Built
December 29, 2004 − Northeast view of completed TMC.
 

 